logo_sdi
  • ABOUT
  • SERVICES
  • TRACK RECORD
  • NEWS
  • CONTACT

Ourika (Portugal) 

  Year: 2016
  Type: Ground based
     Power: 46.000 KWP

OTHER PROJECTS

Vercor II

Vercor II

Elton Lodge

Elton Lodge

Riba-Roja de Turia

Riba-Roja de Turia

Vercor I

Vercor I

Mas Nou

Mas Nou

Brignoles Bar

Brignoles Bar

Labrador

Labrador

Lorca

Lorca

Norton Hall

Norton Hall

Stantway

Stantway

+34 961 363 991 info@develop.suddeutscheinvest.com Av. Jacarandas, 2 - 528. 46100 Burjassot (Valencia) Spain. All rights reserved.